Label Tape

30 November 2009

Label Tape
What was the very last audio cassette tape issued by a major record label? When was it released?

Just curious as to what the last pre-recorded audio music cassette was (other than one released by a record club). I kind of lost track of audio cassettes…I think they disappeared from the record stores in the 1990’s sometime. Thanks!

most major new releases still come out on cassette its just real hard to find them.

Photoshop Tutorial 005: Create a DYMO Tape Label – Part 1


Freezer Labels - Red Border


Freezer Labels – Red Border


$3.80


Great for Freezer Packages, Storage Containers, Cannisters and Bins. Self adhesive, peel and apply. Box of 100 1″ x 2″ Freezer Labels with Red Border…

Oenophilia Label Lift


Oenophilia Label Lift


$4.49


Label Lift
The best way to remove labels. Splits the printed surface of the paper from the adhesive backing leaving a laminated label to place into wine journals.
Carded Pack of 10….

3M Label Tape 2


3M Label Tape 2


$22.99


Preprinted with item, time, date and prepared by information, these label tapes are your most economical label choice. Tape will stick to a variety of surfaces – easy to write on and remove. Can be used from -10 degrees to 160 degrees Ferinheight. 540 Labels per roll….

Sophia Global Remanufactured Brother TZ231 Label Tapes (Pack of 2)


Sophia Global Remanufactured Brother TZ231 Label Tapes (Pack of 2)


$16.99


Brand: Sophia GlobalColor: Black on whiteMaximum yield: 0.5 inch wide x 26.2 feet long

Dymo D1 Black on Silver Tape Label Cassette


Dymo D1 Black on Silver Tape Label Cassette


$10.59


Fill your Dymo label maker with this tape cassette from Dymo. This cassette holds 18 feet of helf-inch black on silver tape.

Sophia Global Remanufactured Brother TZ231 Label Tape (Pack of 5)


Sophia Global Remanufactured Brother TZ231 Label Tape (Pack of 5)


$44.99


Color: Label Tape Black on WhiteBrand: Sophia GlobalModel: SGTZ231Quantity: 5



 Birdengine


Birdengine


$78.8


Used – Please note that the content of this book primarily consists of articles available from Wikipedia or other free sources online. Lawry Joseph Tilbury (born July 10, 1980), better known by his stage name Birdengine, is an English musician and singer-songwriter from Winterbourne Steepleton, Dorset. In 2005, Tilbury released his debut EP Birdengine, a collection of experimental tape melodies, on the now defunct Scottish label Benbecula Records. The self-produced EP was hailed as the first rel

 Birdengine


Birdengine


$78.8


New – Please note that the content of this book primarily consists of articles available from Wikipedia or other free sources online. Lawry Joseph Tilbury (born July 10, 1980), better known by his stage name Birdengine, is an English musician and singer-songwriter from Winterbourne Steepleton, Dorset. In 2005, Tilbury released his debut EP Birdengine, a collection of experimental tape melodies, on the now defunct Scottish label Benbecula Records. The self-produced EP was hailed as the first rele

 Brother Removable Paper Tape for QL PC Label Printers, 2-3


Brother Removable Paper Tape for QL PC Label Printers, 2-3


$40


Brother Removable Paper Tape for QL PC Label Printers, 2-3 DK4605

Subscribe to our Newsletter