Lowprofile Desktop

27 February 2010

Lowprofile Desktop
Will this graphic card fit? 8500 GT?

Here’s the lowprofile graphic card:

http://www.tigerdirect.com/applications/searchtools/item-details.asp?EdpNo=3246361&body=REVIEWS

My PC:

http://www.cyberindian.net/2006/11/04/dell-launches-dell-dimension-c521-desktop/

I’ve recently purchased the 8500 GT. Someone on the Review said he has the same PC & was able to fit it. I had my neighbor come look at it but he said there’s no way this graphic card could fit into the PC. He said the metal part would stick out. So i’m wondering how did that guy fit the 8500 gt into his C521?
Also, are all low profile graphic cards the same size?

wow thats gonna be a tight fit, your pc is 4.5″ wide and the 8500gt is 4.4′ wide…..i dont think it will work, if the motherboard has spacers behind it, it wont work……even w/no spacers, screwed right to the case, im pretty sure it is gonna stick out to much, your only working here w/a .100 thousands of an inch…..you might be able to leave the side cover off, and run like that, but thats just a work around, not a fix……only thing to do, since you say you have the card is just try to put it in and see what hapens…….scott

Gyration Air Mouse Elite with Low-Profile Keyboard


Tripp Lite ISOBAR6DBS 6-Outlet Isobar Premium Protector/Suppressor  (2850 Joules, Tel/Coax)


Tripp Lite ISOBAR6DBS 6-Outlet Isobar Premium Protector/Suppressor (2850 Joules, Tel/Coax)


$53.12


Tripp Lite 5S6BAR 6 DBS ISBAR AC COAX PROTECT 3 ISOLATCD FILTER…

New-Kensington 67723 - MicroSaver Keyed Ultra Laptop Lock, 6 ft. Steel Cable, Two Keys - KMW67723


New-Kensington 67723 – MicroSaver Keyed Ultra Laptop Lock, 6 ft. Steel Cable, Two Keys – KMW67723


$88.89


Features an ultra-thick 8mm carbon-strengthened steel cable. Patented T-bar locking mechanism provides a secure connection. Built-in defense system to guard against tampering. Low-profile lock heads won’t block laptop ports or lift laptop off desk. Locks into the standard Kensington security slot found in 99% of laptops, as well as many flat panel monitors, desktops, printers and other devices. Lo…

Adaptec Serial ATA RAID 2405 ROHS KIT SATA/SAS RAID PCI-E 3Gbs Low-profile Retail Low Profile New


Adaptec Serial ATA RAID 2405 ROHS KIT SATA/SAS RAID PCI-E 3Gbs Low-profile Retail Low Profile New


$518.48


The Series 2 family of Adaptec Unified Serial (SATA/SAS) RAID controllers leverages the same industry-leading dual-core hardware RAID design as our industry-leading Series 5 Performance RAID controllers.The Adaptec RAID 2405 features 800 MHz of processing power, a 128MB of DDR2 write cache, connectivity with the latest X8 PCI-Express, and direct I/O connectivity for SATA/SAS tape devices and hard …


Subscribe to our Newsletter