Dental Stool

31 March 2010

Dental Stool
Should I change my cat food – Wellness or stick it out?

I have always fed my cats good food – Wellness – he had to have dental surgery two weeks ago and had to have three teeth removed. Of course they put him on the Hills t/d food. He had bad diarrhea from that so I put him back on the Wellness-Three weeks later his stool is still very soft. He is a long haired cat and I have to clean up his rear end every time he goes. Should I continue with the Wellness and hope it clears up or does anyone recommend another good quality food I can try.
I do a mixture of wet and dry. I feed them dry in the morning and wet food at night.

Try some Benebac from the pet store – it’s all the “good” bacteria that cats need in their systems. It comes in a small tube, and it’s used for three days. Helps very much with loose stool! Just be sure to check the expiration date on the tubes.

The Wellness is a good food, and once you get him back to “regular” it shouldn’t be a problem. Dry foods aren’t the best thing to be feeding cats, even Wellness, as dry has now been linked to so many feline disorders including diabetes, obesity, constipation, urinary tract disorders and kidney disease. And dry does not clean the teeth – look at a cat’s teeth, they were designed for ripping meat and not for chewing. Canned does not stick to the teeth like dry does, and contributes far less to dental disease and plaque and tartar build up. Add some Wellness canned to his diet – better for his teeth and overall health.

Dental Stool Size


Doctor's & Assistant's Stool - Mirage Series Assistant's and Dentist's Stool


Doctor’s & Assistant’s Stool – Mirage Series Assistant’s and Dentist’s Stool


$659.99


Assistant’s stool – Mirage series Dental Assistant’s stool

Five-leg, ultra stable base, 24″ diameter
Gas cylinder lift for seat height adjustment
Adjustable for right or left hand use
Large, firm cushion seat
Dual wheel casters
Height adjustment: 17″-23″
16 Upholstery color choices
Seat tilt
Dimensions:
Abdominal support
vertical adjustment range: 0″ – 3.5″
Seat width: 18″
Seat height ranges: 2…


Doctor's & Assistant's Stool - Premium Dental Assistant's and Doctor's Stool


Doctor’s & Assistant’s Stool – Premium Dental Assistant’s and Doctor’s Stool


$599.99


Assistant Stool – 080

PU Caster , 5pcs / set
Chair Base
5.5″ Stroke Gas Cylinder
Handwheel knob
Handle for Lift
Handle for forward and recline
Screws
Seat mechanism
Seat plastic cover
Oval tube 19″
Screws
Screws
Outer plastic cover?

Doctor Stool – 081

PU Caster , 5pcs / set
Chair Base
8″ Stroke Gas Cylinder
18″ Foot ring
Handwheel knob of footring
Stopper of back support
Torso u…


Doctor's & Assistant's Stool - Traditional Series Assistant's and Dentist's Stool - DCI Asepsis style Traditional doctor's stool + DCI Asepsis style Traditional assistant's stool


Doctor’s & Assistant’s Stool – Traditional Series Assistant’s and Dentist’s Stool – DCI Asepsis style Traditional doctor’s stool + DCI Asepsis style Traditional assistant’s stool


$799.99


Asepsis Style Traditional Assistant’s Stool

Stool upholstery
6 color options (specify color with message)
Five-leg, ultra stable base, 24″ diameter
Gas cylinder lift for seat height adjustment
Adjustable for right- or left-hand use
Adjustable full ring foot rest
Dual wheel casters
Adjustable anatomical body support bar
Height adjusment 21″-27
Doctors’s Stool
6 color options
Five-leg, ultra st…


My Life As a Screaming Skydiver


My Life As a Screaming Skydiver


$6.92


When Wally becomes involved in international espionage, rocket-powered toilet paper, and exploding dental floss, he ends up having to become a skydiver to save his life and the entire free world.


Subscribe to our Newsletter